Utilities

Screenshot 2023-10-25 162636

The Utilities Department strives to provide citizens with quality drinking water and a safe living environment with the proper treatment and disposal of wastewater. Most of its employees are state-licensed water and wastewater operators. They continue to improve their skills through state-certified training.

Annual Drinking Water Quality Reports

Most Recent Report | View All Drinking Water Quality Reports

graphic with 24/7 Emergency Service Center phone number 501-321-6200 and billing 321-6880

Project Construction Cameras

Use the links below to see the progress of two of the major construction zones that are a part of the Lake Ouachita Water Supply Project: the new water treatment plant and the intake site at Blakely Mountain.

View the New Water Treatment Plant via live stream, scrolling, or skipping back through images that are captured every 30 minutes.Work Zone Cam graphic - Water Treatment Plant Opens in new window
Scroll through images of the Blakely Mountain Intake Site, captured every 30 minutes, during the major construction for the Lake Ouachita Water Supply Project.Work Zone Cam graphic - Intake Site

Blog with updates on Lake Ouachita Water Supply Project

The Lake Ouachita Water Supply Project blog is updated with news items relating to the project...

Blog graphic - Lake Ouachita Water Supply Project Opens in new window

Programs

Cross-Connection Control

graphics for website_backups_crossconnection_Page_2
 

Publications

Hot Springs Utilities

utilities booklet

2020 Standards & Specifications

Standard Specs Cover Page - 3-7-2019

Ordinance 6264

ord.6264

2018 Capital Improvement Plan

2018 Capital Improvement Plan

2018 Water Master Plan

water master plan

2022 Wastewater System Master Plan V1 & V2 - PDF

WW Master Plan Cover Page 2022

2022 Wastewater System Master Plan V1 & V2 - Interactive Book

WW Master Plan Cover Page 2022